3 Appendix B1•

Item.

Cost of: 6" branches.

Main sewers.

Booster pumps.

Totals:

Assumed

population:

Section 1. Section 2. Section 3. Section 4. Total

2,800,000 5,000,000 2,300,000 3,400,000 $13,500,000

530,000 1,400,000. 650,000 1,220,000 3,800,000

60,000 184,000 156,000 230,000 630,000

3,390,000 6,584,000 3,106,000 4,850,000

225,000 300,000 112,500 112,500

Cost per Head:

$15

$22

825

$39

nor for The high

This does not include for the main pumping the pipe line and sewage farm in the Shatin Valley. cost ($39 per head) for Section IV is due to the great length of main sewer; on the present assumption that it must lead to the Railway Tunnel. I consider that it may be practicable and considerably cheaper, to modify this Section and to have a sepa- rate disposal works behind Kai Tak. Sinoe the area is not now developed, there is time to consider this further. I consider that it is proper to estimate oosts per head of the System to the main pumping station, at $23 per head, average.

11.

up

Further notes will be submitted as soon as I can find the time to study the matter further.